DevOps / SRE / Platform Engineer / Stage 6 · Delivery

Choose a rollout strategy and reconcile desired state

CoreAdvancedDraft, not yet reviewed20 min of activities

"Already know" meets prerequisites. "Not relevant" removes the topic from your total but leaves what builds on it waiting.

Self-check

  • Release version 2 of a service next to version 1 behind a proxy. Shift a share of traffic, watch an error rate, roll back, and compare that with rolling, blue-green and GitOps-driven releases.
  • Evidence to include: Record the traffic split, the signal you watched, the moment you decided to roll back and how long it took, and a table of the four strategies with one risk each.

Try it without the material first, then compare. Save your answer in your notes below. Report a problem with this self-check

Learning activities

5 activities

My notes

Saved on this device, synced when signed in
Esc
↑ ↓ to move↵ to open