DevOps / SRE / Platform Engineer

A connected route from foundations to production systems: 13 stages and about 248 hours, including practice and projects. Learn, practise, and prove each stage.

Set a target
Your progress0 of 36 topics
Current stageOperating a host

Stage 1 of 13

Your paceNot set

Set a target on the planner

Take the placement check (10 min)

Draft. This path has not been reviewed by a second person yet. Topic order, estimates and tasks may change.

Arrows run from a prerequisite to what it unlocks. Select a topic to open it.
Filled: doneHeavy outline: in progressDashed: waiting on a prerequisiteDotted: skipped

The list view has the same topics and works with any screen reader.

  1. Stage 1: Operating a host

    3 topics · 18 h · milestone: Run a service in WSL under systemd0 / 3
    Stage project and rubric

    Run a service in WSL under systemd. Restart it, diagnose a permissions fault and leave a tested recovery script.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The service starts at boot, restarts after you kill it, and its journal shows both, on a clean WSL instance.
    • You diagnose the permissions fault from process, file and user evidence, and the fix grants no more than the service needs.
    • The recovery script is idempotent: running it twice leaves the host in the same working state.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  2. Stage 2: The network path

    4 topics · 18 h · milestone: Connect two local services through a reverse proxy0 / 4
    Stage project and rubric

    Connect two local services through a reverse proxy. Diagnose a DNS, TLS or firewall misconfiguration from observations.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • Both services answer through the proxy, and a capture or log shows each hop the request takes.
    • For the injected fault you name the layer from observations, before changing anything.
    • You write the checklist you followed, in order, so someone else could repeat the diagnosis.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  3. Stage 3: Shared changes

    2 topics · 8 h · milestone: Land a reviewed configuration change in a disposable repository and recover its previous behaviour0 / 2
    Stage project and rubric

    Land a reviewed configuration change in a disposable repository and recover its previous behaviour.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The change lands through a reviewed branch, with a note saying what changes, how to verify it and how to undo it.
    • You resolve a real conflict deliberately and explain why the kept lines are right.
    • You restore the previous behaviour with history intact, and show the commit that did it.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  4. Stage 4: The service you operate

    3 topics · 14 h · milestone: Build and run the small typed service the later stages package, deploy and observe, and explain each part of a request through it0 / 3
    Stage project and rubric

    Build and run the small typed service the later stages package, deploy and observe, and explain each part of a request through it.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The service builds and runs from a clean checkout with one documented command.
    • You trace one request from socket to handler to response, naming each layer.
    • A typed input error is rejected with a clear status and message, and a test proves it.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  5. Stage 5: Packaging services

    3 topics · 18 h · milestone: Start an app and database with Compose0 / 3
    Stage project and rubric

    Start an app and database with Compose. Preserve a record after replacing the application container.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The image runs as a non-root user, reports healthy, and stays under its size budget; the verifier passes.
    • A record survives replacing the database container, and the verifier's --after run passes.
    • You list the image's inputs: pinned base digest, SBOM packages, and what a signature would prove.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  6. Stage 6: Delivery

    2 topics · 16 h · milestone: Release two versions to local slots0 / 2
    Stage project and rubric

    Release two versions to local slots. Shift traffic, observe health and roll back.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The same immutable build is promoted from test to the live slot; nothing is rebuilt on the way.
    • You shift a share of traffic, watch a stated signal, and roll back within a time you measured.
    • You compare rolling, blue-green, canary and GitOps for this service and justify your choice.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  7. Stage 7: Cloud fundamentals on AWS

    4 topics · 26 h · milestone: Design a private service and a least-privilege role0 / 4
    Stage project and rubric

    Design a private service and a least-privilege role. Verify the policy against real requests and estimate the cost locally.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The diagram shows every route, subnet and gateway, and a request's path through them is labelled.
    • The role's policy passes the IAM practice checker's least-privilege tests for your service.
    • You estimate the monthly cost from stated inputs and name the largest driver.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  8. Stage 8: Infrastructure changes

    2 topics · 20 h · milestone: Provision local resources with OpenTofu0 / 2
    Stage project and rubric

    Provision local resources with OpenTofu. Detect drift and converge twice without recreating data.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • A second apply reports no changes; nothing holding data is destroyed or recreated.
    • You introduce drift by hand, show it in a plan, and converge it back.
    • State is kept outside the working directory, and you explain how you would recover it.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  9. Stage 9: Operating a cluster

    3 topics · 36 h · milestone: Deploy an app in kind with a volume0 / 3
    Stage project and rubric

    Deploy an app in kind with a volume. Recover a failed rollout and verify service access.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The app reaches Ready behind a Service, and survives deleting one pod with its data intact.
    • You diagnose and fix a failed rollout from events and probes, then roll back with Helm.
    • A team role can deploy but cannot read secrets, proven by a refused request.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  10. Stage 10: Signals in production

    2 topics · 18 h · milestone: Build a dashboard and alert for a failing worker0 / 2
    Stage project and rubric

    Build a dashboard and alert for a failing worker. Link one sampled request from metric to trace.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The dashboard shows the worker's rate, errors and queue depth, from scraped metrics.
    • The alert fires when the worker stops, and its for duration is justified against noise.
    • You follow one slow request from a metric to its trace and name the slow span.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  11. Stage 11: Reliability practice

    3 topics · 24 h · milestone: Lead a local incident drill and write a blameless report with a measurable toil reduction0 / 3
    Stage project and rubric

    Lead a local incident drill and write a blameless report with a measurable toil reduction.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The objective is stated as an SLI, a target and a window, with the error budget it leaves.
    • The drill has a timeline, a named incident commander and a restore within the target you set.
    • The postmortem is blameless and ends with a toil-reducing action and how it will be measured.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  12. Stage 12: Secure operations

    3 topics · 16 h · milestone: Deploy a least-privilege workload0 / 3
    Stage project and rubric

    Deploy a least-privilege workload. Verify its policy and replace a test secret without exposing it in logs.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • The workload runs under the restricted pod security level, and a privileged pod is refused.
    • A test secret is rotated, and you show it never appears in logs, images or the repository.
    • A policy-as-code rule refuses an unpinned image, with a test for both outcomes.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

  13. Stage 13: A platform for other engineers

    2 topics · 16 h · milestone: Deliver a service template with a pipeline, dashboards and an owner0 / 2
    Stage project and rubric

    Deliver a service template with a pipeline, dashboards and an owner. Have another service adopt it locally.

    Use your own small service or a disposable local example. Score each criterion: 0 missing, 1 partial, 2 demonstrated.

    • A second service adopts the template and reaches a healthy deployment; you measure how long it took.
    • The template has a named owner, a support route and a documented upgrade path.
    • You decide whether to add a service mesh, with the evidence and the signal that would change your mind.

    Target: 2 on every criterion. Record your evidence in the notes of the stage's last topic. Report a problem with this project.

Source inventory and coverage

36 topics map to 93 unique activities. Shared resources count once. Every topic has a self-check; every stage has a project rubric.

Supplementary pages kept outside this path:

Pages under Library and Practice come from, or build on, Donne Martin's System Design Primer (CC BY 4.0).